
This project involved the installation of temporary construction barricades within an active airport interior environment .
The scope required:
Interior framing systems designed for temporary structural stability
Surface protection to prevent floor and adjacent area damage
Reinforcement adjustments to meet project stability requirements
Precise coordination in a high-traffic operational environment
The barricade system was engineered to maintain public safety, visual integration, and uninterrupted airport operations throughout the construction phase.